![HDG Pelletmaster 15 Operation Manual Download Page 56](http://html.mh-extra.com/html/hdg/pelletmaster-15/pelletmaster-15_operation-manual_2112434056.webp)
4 Planning and installation – Installing the heating system
56
2.
Lay the seal (1) on the flange of the rotary feeder (2).
3.
Bolt the pellet vacuum container (1) firmly to the flange (2) using
a 13 mm spanner.
4.
Remove the front lock nut of the enclosed fill level sensor.
5.
Insert the fill level sensor (1) in the opening provided for this in the
pellet vacuum container (2).
6.
Mount the fill level sensor in the pellet vacuum container so that
the thread protrudes at least 1.5 cm into the container.
7.
Counter the locking nut (3).
Figure 4/33 - Installing the pellet vacuum container
1
2
Figure 4/34 - Mounting the fill level sensor
1
3
2
Summary of Contents for Pelletmaster 15
Page 1: ...hdg bavaria com HDG Pelletmaster 15 25 Operation Manual V 03 08 2008 ...
Page 2: ......
Page 170: ...170 HDG Pelletmaster 15 25 V 03 en HDG Bavaria GmbH 08 2008 ...
Page 171: ......