4 Planning and installation – HDG hydraulic systems
93
H
YDRAULIC
SYSTEM
6
Figure 4/80 - Hydraulic system 6
P
e
ll
et
m
a
s
ter
M
M
M
M
M
M
M
M
Bt
Bb
RT
ST
OT
A9/10
A5
F5
F4
A7/8
F2
A4
A3
A6
F9
A1/2
CCT1
CCT2
CCT3
HDG Pelletronic
Connection
OT
S
Outdoor temperature sensor
40 / 41
ST
Supply temperature sensor
(boiler temperature)
48 / 49
RT
Return temperature sensor
46 / 47
Bt
Buffer top sensor
44 / 45
Bb
Buffer bottom sensor
42 / 43
Summary of Contents for Pelletmaster 15
Page 1: ...hdg bavaria com HDG Pelletmaster 15 25 Operation Manual V 03 08 2008 ...
Page 2: ......
Page 170: ...170 HDG Pelletmaster 15 25 V 03 en HDG Bavaria GmbH 08 2008 ...
Page 171: ......