
24
CPW 0604 BA CPW 0604 Issue 10.09.13 (From Software-Release 0.0.1.31)
Plug-in the control cable into the related plug connection of the power unit.
Twist the retaining nut of the control cable connector clockwise to secure the
connection.
The welding cables must not be coiled during welding. Coiled
cables work as a coil and may negatively affect the welding
result. Before welding, lay out the cables lengthwise.
Fix the cables. Strong magnetic fields occur during welding which may cause a
movement of the cables. This may cause a slackness of the connections.
Connections VBZ / PBZ
3 Starting-up
3.5 Connecting the Power Units to the CNC Production Welder