
HAULOTTE GROUP
5
LIST OF ILLUSTRATIONS
Figure 2-1. Range of Motion............................................................................................................ 15
Figure 3-1. Ground (Lower) Control Panel ....................................................................................22
Figure 3-2. Platform (Upper) Control Panel ...................................................................................25
Figure 3-3. Platform Controls Joystick .......................................................................................... 28
Figure 3-4. Boom Travel Latches ................................................................................................... 29
Figure 3-5. Outrigger Control Panel ............................................................................................... 30
Figure 3-6. Drive Speed Selector.................................................................................................... 32
Figure 3-7. Manual Break Release.................................................................................................. 32
Figure 3-8. Hand Pump Controls for Manual Operation ...............................................................33
Figure 3-9. Location of Lift Cylinders for Manual Boom Lowering .............................................34
Figure 3-10. Location of Manual Lowering Valves..........................................................................34
Figure 3-11. Lifting the Aerial Work Platform..................................................................................35
Figure 3-12. Transport the Aerial Work Platform ............................................................................36
Figure 4-1. Battery Charger Faceplate ........................................................................................... 38
Figure 4-2. Outrigger Position Switch............................................................................................ 41
Figure 4-3. Hydraulic Reservoir...................................................................................................... 42
Figure 4-4. Wheel Nut Tightening Sequence.................................................................................44
Figure 4-5. Display Run Time Hours .............................................................................................. 45
Figure 4-6. Machine Position for Slew Ring Measurement ..........................................................46
Figure 4-7. Slew Ring Position Measurement ...............................................................................46
Figure 4-8. Platform Position After Rotation .................................................................................46
Figure 4-9. Position Machine for Leveling..................................................................................... 48
Figure 4-10. Level Sensor Digitally Based....................................................................................... 48
Figure 4-11. Level Sensor Pendulum Based ...................................................................................48
Figure 4-12. Ground (Lower) Control Panel for Leveling System .................................................49
Figure 4-13. Platform Position .......................................................................................................... 50
Figure 4-14. Ground (Lower) Control Panel for Overload Protection ...........................................50
Figure 4-15. Manual Outrigger Control Wire Harness ....................................................................54
Figure 4-16. Bottom Side of the Ground (lower) Control Box. ......................................................54
Figure 4-17. Hydraulic Power Unit.................................................................................................... 54
Figure 4-18. Attaching the Pressure Gauge to the Hydraulic Power Unit. ...................................55
Figure 4-19. Motor Controller............................................................................................................ 68
Figure 5-1. Location of Master Cylinder ........................................................................................ 71
Figure 5-2. Location of Slave Cylinder........................................................................................... 72
Figure 5-3. Location of Manual Lowering Valves for Lift Cylinder Replacement ...................... 73
Figure 5-4. Push “Button” Lowering Valve ...................................................................................73
Figure 5-5. Lift Cylinder Replacement ........................................................................................... 73
Figure 5-6. Outrigger Cylinder Replacement.................................................................................75
Figure 5-7. Cylinder Valve Removal ............................................................................................... 75
Figure 7-1. Disconnect Plug from Load Sense Module ................................................................88
Figure 7-2. Remove Platform (Upper) Control Box. ......................................................................88
Figure 7-3. Loopback plug .............................................................................................................. 88
Figure 7-4. Platform Removal ......................................................................................................... 89
Figure 7-5. Material Lifting Hook Installation ................................................................................ 89
Figure 7-6. Material Lift “Stowed” Position ................................................................................... 90
Figure 7-7. Material Lift “In Use” Position ..................................................................................... 90
Figure 7-8. Manual Platform Rotator .............................................................................................. 91
Figure 9-1. Minimum Safe Approach Distance............................................................................114
Summary of Contents for xlb-4725a
Page 1: ...OPERATOR S MAINTENANCE MANUAL B33 01 0104 Rev 4 August 2012...
Page 70: ...HAULOTTE GROUP 5 CYLINDER REPLACEMENT 70...
Page 78: ...HAULOTTE GROUP 6 DECAL REPLACEMENT 78 DECAL KIT ANSI...
Page 80: ...HAULOTTE GROUP 6 DECAL REPLACEMENT 80 IDENTIFICATION PLATES OPTIONAL EQUIPMENT ANSI...
Page 86: ...HAULOTTE GROUP 6 DECAL REPLACEMENT 86...
Page 92: ...HAULOTTE GROUP 7 OPTIONAL EQUIPMENT 92...
Page 98: ...HAULOTTE GROUP 8 MATERIAL SAFETY 98 MATERIAL SAFETY DATA SHEET POWERFLOW AW HVI HYDRAULIC OIL...
Page 116: ...HAULOTTE GROUP 9 ANSI REPRINT 116...