the LAMP connector:
N
– the neutral wire of the lamp
L
– lamp phase wire
Fluorescent lamps must not be used as traffic lights.
4.7.
Power connection
The last stage of connection is to connect the controller power supply, connect
in turn the wires:
PE
– protective conductor
L
– phase wire
N
– neutral wire
Protect the controller power supply by using a residual current
circuit breaker.
5. Put the quick couplers back into the controller.
Before starting the device, check the power supply, grounding
and wiring. The cables should not be too long, it is not allowed to wind
the remaining cable in the so-called "loops" and simultaneous routing
of the controller power supply, motor and control cables.
6.
Manually move the gate to the closed position.
7.
FROM HLB9C REV 1.7 VERSION
select 1-leaf or 2-leaf operating mode -
according to the procedure described in paragraph PROGRAMMING> OPERATING
MODE.
8. Turn on the power.
9. Check the opening direction.
Pressing the SBS manual control button or the programmed transmitter
activates the gate in the opening direction, otherwise, swap the wires connected to
the OP and CL connectors (after disconnecting the power supply first).
10.
Adjust the thrust of the motors.
The thrust is regulated with the FORCE potentiometer. Adjustments should be
made with a screwdriver - clockwise rotation increases the thrust force, on the
17