6. At this time a second bale can be
picked up on the forks and brought
along to the feeding area if desired.
Important: When the second bale is
loaded on the bale tines, make sure
that the loaded bale does not interfere
with the cradle operation.
Interference can cause damage to the
cradle.
7. Processing:
a. Set the discharge deflector to the
desired position.
b. Start the tractor and run on idle.
c. Drive to the desired unloading
location.
d. With the tractor on idle, slowly
engage PTO.
e. Increase engine RPM to rated
PTO speed.
f. Engage rocking bale cradle
hydraulic circuit.
IMPORTANT
The processor is equipped with an 80º
constant velocity drive line. When
operating the Bale Processor, keep the
PTO drive line as straight as possible
to have the universal joint angles as
small as possible during operation.
Avoid sharp turns with the PTO
engaged. If a sharp turn is unavoida-
ble, disengage the PTO for the turn
and then re-engage when appropriate
to do so. Operating at more than 80º
will damage the CV joint and will void
warranty.
- 4.9 -
4.7 Field Operation Continued
Summary of Contents for 2958
Page 2: ......
Page 6: ...PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...3 2 3 Safety Decal Locations...
Page 15: ...3 3 3 Safety Decal Locations...
Page 17: ...3 5 3 2 Information Decal Locations...
Page 36: ...5 5 5 4 PTO...
Page 43: ...7 3 Bolt Torque 38 7 2...
Page 44: ...7 3 7 4 Overall Dimensions...
Page 45: ...7 4 7 4 Overall Dimensions...
Page 46: ...7 5 7 4 Overall Dimensions...
Page 47: ...PAGE INTENTIONALLY LEFT BLANK...
Page 52: ...N 10 1...
Page 53: ......
Page 54: ...H S MFG CO Products approved for the FEMA SEAL OF QUALITY...