2 -
10
PTF-71-2RZ –
PTO Drive
Spinner Gear Case
- Parts List
Ref. Part Number
Description
Qty.
1
PTF-1AZ
Housing
1
2
PTF-3
Gasket
1
3
PTF-2A
Cover
1
4
PTF-4
Cap screw
6
5
PTF-5
Lock Washer
6
6
PTF-6
Shaft
1
7
PTF-11
Oil Seal
4
8
PTF-12
Retaining Ring
4
9
PTF-10R
Race Bearing
4
10
PTF-10C
Cone Bearing
4
11
PTF-16
Thrust Washer
4
12
PTF-13
Retaining Ring
2
13
PTF-8P
Pinion
1
14
PTF-18A
Shim (0.005)
2
15
PTF-9
Pin
2
16
PTF-7A
Shaft
1
17
PTF-8B
Gear
1
18
PTF-2B
Cover
1
19
PTF-19B
Gasket
1
20
PTF-17
Lock Washer
4
21
PTF-15A
Cap screw
4
22
PTF-14
Pipe Plug
1
23
PTF-22
Zerk
1
24
PTF-18B
Shim (0.010)
2
25
TC-15
Vent Plug
1
Summary of Contents for PT-6 FSS
Page 1: ...Model PT 6 FSS Fertilizer and Lime Spreader SERIAL __________________ WORK ORDER ___________...
Page 2: ......
Page 8: ......
Page 12: ......
Page 13: ...Fertilizer and Lime Spreader Safety...
Page 17: ...S 4 PTO SAFETY DECAL...
Page 19: ...S 6 HYDRAULIC SYSTEM DECAL...
Page 20: ...S 7 ROTATING CHAIN WARNING ROTATING SPINNERS WARNING...
Page 21: ...PTO Shaft Adjustment And Maintenance...
Page 24: ......
Page 25: ...Section 1 Basic Information...
Page 26: ...1 1 6PT FSS...
Page 27: ...1 2...
Page 29: ...Section 2 PTO Drive Spinners...
Page 33: ...2 4...
Page 36: ...2 7 Hydraulic Cylinder Engagement Assembly...
Page 38: ......
Page 39: ...PTF 71 2 RZ PTO Drive Spinner Gear Case Assembly and Parts List...
Page 43: ...Section 3 Full Press Wheel Drive Assembly...
Page 44: ...3 1...
Page 47: ...3 4...
Page 48: ...3 5...
Page 49: ...3 6 Hydraulic Cylinder Engagement Assembly...
Page 51: ...PTF 71 2 RZ FP Full Press Wheel Drive Spinner Gear Case Assembly and Parts List...
Page 55: ...Section 4 Press Wheel for Plug to Tractor Hydraulic Spinners...
Page 58: ...4 3...
Page 61: ...4 6 Hydraulic Cylinder Engagement Assembly...
Page 63: ...Section 5 Hydraulic Spinners...
Page 64: ...5 1...
Page 67: ...5 4...
Page 68: ...5 5...
Page 74: ......
Page 75: ...Section 6 Flow Divider Assembly...
Page 76: ......
Page 77: ...5 4...
Page 79: ...Section 7 Rigid Axle Assembly...
Page 80: ...7 1 6 Bolt 7 000 per Pair Hub Assembly J I H G A F E C B D L K...
Page 82: ...7 3 8 Bolt 12 000 per Pair Hub Assembly J I H G A F E C B D L K...
Page 85: ...Section 8 Basic Set Up Operation...
Page 88: ...8 3...
Page 90: ......
Page 91: ...Section 9 Maintenance Troubleshooting...
Page 97: ...Section 10 Spread Pattern...
Page 101: ...10 4 Data Recording...
Page 102: ...10 5 Data Recording Unacceptable Pattern Acceptable Pattern...
Page 104: ...10 7 Acceptable Pattern Using a 3 Pass Switchback Driving Method...
Page 106: ...10 9 Notes...