12
STEP 2: Cart
1.
Turn bottom shelf right side up as shown in
Fig. 2
.
2.
Attach front panel with the correct direction marked “UP” to front of bottom shelf with three
(3) M5 x 10 screws as shown in
Fig. 2
.
3.
Attach left panel (marked “L”) to front panel with three (3) M4 x 10 screws as shown in
Fig. 2
.
Attach left panel to bottom shelf with one (1) M5 x 10 screw as shown in
Fig. 2
.
4.
Attach right panel (marked “R”) to front panel with three (3) M4 x 10 screws. Attach right
panel to bottom shelf with one (1) M5 x 10 screw as shown in
Fig. 2
.
ASSEMBLY
ASSEMBLY STEPS
Fig. 2
Summary of Contents for OG01
Page 7: ...7 BEFORE YOU BEGIN GRILL PARTS DIAGRAM GRILL PARTS DIAGRAM ...
Page 16: ...ASSEMBLY ASSEMBLY STEPS STEP 5 Side Shelves Fig 5b 16 Fig 5c ...
Page 39: ...39 AVANT DE COMMENCER SCHÉMA DES PIÈCES DU BARBECUE ...
Page 48: ...ASSEMBLAGE ÉTAPES DE L ASSEMBLAGE ÉTAPE 5 Tablettes latérales Fig 5b Fig 5c 48 ...