System Cable Harness Details
(see also Table of Connections 22-39)
#
Powerpole
type
Description
1.
45A
M300 +ve DC output to Digital LCD Power Meter/Analyser.
2.
45A
M300 -ve DC output to Digital LCD Power Meter/Analyser.
3.
45A
Service Battery Bank –ve taking up 2 45A Powerpoles in order to be able to handle up to 90A.
4.
30A
Red, Green, Black Powerpoles used for the BEP 701-MD remote switch.
5.
45A
SOLAR Input – takes power from the front of the SCP faceplate Solar input, to the Digital LCD Power Meter/Analyser and
relays it from here to the CTEK D250S.
6.
45A
12V DC GND for internal devices via 45A Anderson Powerpoles. Combined with #7 below this was introduced to allow extra
power if required for any internal devices. Connect your devices here.
7.
45A
12V DC +ve from Smartpass to Digital LCD Power Meter/Analyzer and then to the 2x DC Output sockets at the front of the
SCP faceplate. These sockets are limited to 15A draw. This is why you will also find here a short, 2xPowepole cable, white &
black, left loose. This was introduced to allow extra power if required. Connect your devices here.
8.
30A
DC IN from Alternator Battery to the Start Battery Voltmeter. (12V DC 3A fused).
9.
30A
DC IN from Service Battery Bank to Merlin Smart Gauge battery monitor (12V DC 3A fused).
10.
C14 AC power outlet –takes AC power from the front of the SCP faceplate (AC IN), and relays it to the M300 charger. The
M300 then outputs DC to #1.
11.
C13 AC power inlet – takes power from inerter output to the “Plug-In Power and Energy Monitor Socket” on the SCP
faceplate (AC Out).
12.
Inverter remote control connection (RJ11)