Operation &
Maintenance
Manual
Issue: 09
A6ML0165 - Euroblast PF Manual
Date: 05/2019
Page: 62
8. FAQ’s
Static Electricity
Cabinet, media and component
Un-insulated earth braid wrapped round the media hose and/or connected to the component and then
earthed to the cabinet and extraction equipment provides a drain path.
Static build-up on extraction hose
Un-insulated earth braid wrapped round the extraction hose and earthed to the cabinet and extraction
equipment provides a drain path.
If you experience any problems with static electricity please contact our Service Department
FAULT-FINDING CHECKS SHOULD ONLY BE CARRIED OUT BY A FULLY
QUALIFIED ENGINEER
IF REQUIRED THE BLAST CABINET AND ALL ITS ANCILLARY
EQUIPMENT SHOULD BE FULLY ISOLATED BEFORE PERFORMING ANY
FAULT FINDING CHECKS
IF REQUIRED ENSURE ALL AIR SUPPLIES ARE TURNED OFF AND THE
SYSTEM IS FULLY EXHAUSTED BEFORE PERFORMING ANY
MAINTENANCE
Summary of Contents for Euroblast PF
Page 80: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 80...
Page 81: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 81...
Page 82: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 82...