Operation &
Maintenance
Manual
Issue: 09
A6ML0165 - Euroblast PF Manual
Date: 05/2019
Page: 13
3.2.1 Compressed air connections
The air supply should be from a manual shut-off valve that will exhaust down-stream air and be clean,
dry and oil-free.
The machine requires a compressed air supply at a maximum of 6.0 bar (90 psi) at the filter inlet and
pipework of adequate diameter to provide the flow rate required (see
). The
minimum recommended bore for the compressed air line is 1” and it connects to a 3/4” BSP thread.
Take care that any jointing material (e.g. PTFE tape) does not enter the pipework.
Connect the main compressed air supply to the pneumatic isolator valve.
Summary of Contents for Euroblast PF
Page 80: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 80...
Page 81: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 81...
Page 82: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 82...