Operation &
Maintenance
Manual
Issue: 09
A6ML0165 - Euroblast PF Manual
Date: 05/2019
Page: 10
3. Installation
The system will comprise of the following units:
•
Blast Cabinet/Cyclone/Dust Collector
Flexible extraction hoses, sealing bands and hose clamps are supplied to connect these together.
Remove packing materials and check inside blast cabinet for loose items.
3.1 Location
The equipment must be located on a clean, dry surface.
Locate the cabinet in the required position and orientation; always allow sufficient room around the
units to fully open doors and to give access for operation and maintenance.
Care should be taken to ensure all parts of the system are level
Summary of Contents for Euroblast PF
Page 80: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 80...
Page 81: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 81...
Page 82: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 82...