Operation &
Maintenance
Manual
Issue: 09
A6ML0165 - Euroblast PF Manual
Date: 05/2019
Page: 16
3.2.3 Electrical connections
Electrical installations should only be carried out by qualified electricians
Please see “Electrical Installation of Dust Collectors and Cyclones” in the appendix
Power supplies should be
taken to the starter boxes
situated on the side of the dust
collector and cyclone.
The electrical supply to the lighting on the
cabinet is via an IEC lead.