4.2 Media levels
The media should be added to the pressure pot either via the 75/16 cyclones upper door or the
CY600 cyclones filler chute. ¼ - ¾ of a 25kg bag of media should suffice.
NOTE:
If a HE cyclone is fitted, media should be added to the cabinet hopper.
4.2.1 Adding media to 75/16 cyclone
•
Turn off the dust collector
•
Turn off the cyclone
•
Open the upper cyclone door
•
Pour media into the cyclone
•
Close the door
•
Turn the dust collector on
•
Turn the cyclone on
The upper door should always be used so the media
can pass through the sieve before it gets to the mixer
box.
4.2.2 Adding media to CY600 cyclone
•
Turn off the dust collector
•
Turn off the cyclone
•
Open the filler chute flap
•
Pour media into the cyclone
•
Close the filler chute flap
•
Turn the dust collector on
•
Turn the cyclone on
Summary of Contents for Euroblast PF
Page 80: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 80...
Page 81: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 81...
Page 82: ...Operation Maintenance Manual Issue 09 A6ML0165 Euroblast PF Manual Date 05 2019 Page 82...