
Günter & Hauer
12
HOB MOUNTING
A special sealing gasket and a set of brackets for fastening are added to the hob. To
install the hob, perform the following operations:
• Remove the pan support and splitter
covers.
• Turn the appliance over and mount the
sealing gasket S at its edges (in some
cases the gasket will already be installed at
the factory).
• Insert the hob into the built-in hole in the
worktop and fix it with the screws C
inserted in the mounting brackets B
(fastening clips).
The tension of the screws must be
sufficient for the sealant to come out, the
excess of which can be easily removed.
INSTALLATION PREMISES
This appliance is not connected to combustion products removal equipment. A
combustion product removal system must be provided in the room where the hob is
installed.
This can be either a hood or a fan on the window or vent, which is switched on when
using the appliance. The room where the appliance is installed must have a natural air
supply for normal gas combustion and for ventilation. The air volume must be at least
20 m3.
The natural flow of air should occur directly through the vents in the wall, or through
an air duct. The use of indirect ventilation by means of air extraction from the premises
adjacent to the kitchen is also allowed, provided that the current norms are observed.
The minimum cross-section of the ventilation opening must be 200 cm2.
HOB OPERATION
To ensure maximum efficiency of the burner, it is strongly recommended to use
only pans and frying pans with a flat bottom, appropriate in size to the burner used,
(A) Sealing gasket
(C) Screw
(B) Bracket