![GSi Protek 1000 Series User Manual Download Page 73](http://html1.mh-extra.com/html/gsi/protek-1000-series/protek-1000-series_user-manual_2275148073.webp)
0
2) Use a soft cloth dampened with water to clean the instrument.
NOTICE:
To avoid damage to the surface of the instrument or probes, do not use any
abrasive or chemical cleaning agents.
Storage of Scope meter
If the test tool is to be stored for a long time, it is required to charge the lithium battery
before storage.
Charging the oscilloscope
The lithium battery is possibly not charged when delivery. To make the battery with
enough electric quantity, it must be charged for 4 hours (the test tool must be turned
off during charging). The battery can supply power for 4 hours after being charged
completely.
Notice:
To avoid superheat of battery during charging, the environment temperature is not
allowed to exceed the permissible value given in technical specification.
Note:
No hazard will occur even connecting the charger for a long time, e.g. during a whole
weekend. The instrument can automatically switch to slowly charging status.
Replacing the Lithium Battery Unit
It is usually not required to replace the battery unit. But when it is required to replace it,
only qualified personnel can carry out this operation, and only use the same specification
lithium battery.
1000MENUAL.indd 70
2009-04-06 �� 9:07:25
Summary of Contents for Protek 1000 Series
Page 1: ...1000MENUAL indd 1 2009 04 06 9 06 39...
Page 2: ...1000MENUAL indd 2 2009 04 06 9 06 40...
Page 3: ...USER S MANUAL 1000MENUAL indd 3 2009 04 06 9 06 44...
Page 4: ...USER S MANUAL 1006 1020 1050 1160 1260 1000MENUAL indd 1 2009 04 06 9 06 45...
Page 10: ...Figure 1 1 Protek1000 Series H H Scope Meter Front Panel 1000MENUAL indd 7 2009 04 06 9 06 46...
Page 26: ...23 Figure 2 7 Invert off Figure 2 8 Invert on 1000MENUAL indd 23 2009 04 06 9 07 04...