Super Free Match
Service Manual
INSTALLATION
102
5.7
Installation Instruction
1)
Check the installation location and ensure it is strength and level. Otherwise, there should be enough space to
install drainage pipe, so that the condensed water can be discharged.
2)
Reference to the size of hanger metal and drill 4 holes in the installation location.
3)
Hang the hanger bolts.
4)
Fix the modules securely with the hanger bolts. You can get the M10 or M8 hanger bolts, nuts and washers
from the market.
5)
Adjusting the nuts position, so that the BU module should be level in front/back and left/right.
Summary of Contents for R410A
Page 1: ...SUPER FREE MATCH SERIES SERVICE MANUAL T1 R410A 50Hz GC201306 CENTRAL AIR CONDITIONERS ...
Page 5: ...Super Free Match Service Manual PRODUCT 1 PRODUCT ...
Page 28: ...Super Free Match Service Manual CONTROL 24 CONTROL ...
Page 29: ...Super Free Match Service Manual CONTROL 25 Control 1 OPERATION FLOWCHART ...
Page 31: ...Super Free Match Service Manual CONTROL 27 1 2 Heating Operation ...
Page 66: ...Super Free Match Service Manual INSTALLATION 62 INSTALLATION ...
Page 97: ...Super Free Match Service Manual INSTALLATION 93 ...
Page 129: ...Super Free Match Service Manual MAINTENANCE N 125 MAINTENANCE ...
Page 153: ...Super Free Match Service Manual MAINTENANCE N 149 4 2 3 BU module FXB3A K ...
Page 154: ...Super Free Match Service Manual MAINTENANCE 150 FXB5A K ...
Page 217: ...JF00301896 ...