11
2.2.1 HANDLING AND UNPACKING
Upon delivery, the machine must be in per-
fect shape and the packing material must not
be incomplete or damaged. Pay attention to
the indications on the packing: (e.g. FRAG-
ILE, UP/DOWN, PROTECT FROM
RAIN…) The machine is quite heavy and
has imposing dimensions (see below). Pro-
vide for adequate lifting and handling de-
vices in order to proceed safely.
The machine must be handled using a lift-
truck of sufficient capacity. The truck forks
must be opened as much as possibile to
avoid toppling the device.
The device must be lifted at its centre (centre
of gravity on the axis).
e
p
y
T
o
/
w
e
n
i
h
c
a
M
g
n
i
k
c
a
p
H
x
L
x
W
)
g
k
(
t
h
g
i
e
W
l
l
a
r
e
v
O
f
o
s
n
o
i
s
n
e
m
i
d
g
n
i
g
a
k
c
a
p
d
n
u
o
r
g
H
x
L
x
W
)
g
k
(
t
h
g
i
e
W
s
n
o
i
s
n
e
m
i
d
l
l
a
r
e
v
O
g
n
i
g
a
k
c
a
p
e
t
a
r
c
f
o
H
x
L
x
W
)
g
k
(
t
h
g
i
e
W
0
4
1
0
3
1
1
x
0
6
6
x
0
4
1
2
0
8
3
0
1
4
1
x
0
2
7
x
0
0
5
2
0
3
4
0
1
4
1
x
0
2
7
x
0
0
5
2
0
3
5
0
6
1
0
3
1
1
x
0
6
6
x
0
4
3
2
0
1
4
1
x
0
2
7
x
0
0
5
2
0
0
5
0
1
4
1
x
0
2
7
x
0
0
5
2
0
0
6
0
0
2
0
3
1
1
x
0
6
6
x
0
4
7
2
0
0
5
0
1
4
1
x
0
2
7
x
0
5
9
2
0
7
5
0
1
4
1
x
0
2
7
x
0
5
9
2
0
7
6
Do not drop or turn the machine over, e.g.
when unloading.
Note: lifting by slings is advised against;
such handling is performed under the
entire responsibility of the person
handling the machine (since the machine
may suffer deformation).
2.2.2 INSTALLATION ROOM
REQUIREMENTS
In order to carry the machine indoors after
the trays have been removed (their insertion
being quite simple), an 80cm wide door is
required.
The machine must be installed in a properly
ventilated room (in particular when using gas
heating) with correct lighting and an ambient
temperature in the range from -10
°
C to +
40
°
C (temperature limits for the electronic
frequency regulator of the driving motor).
Sufficient space must be left around the
machine to allow for correct functioning:
5 to 10cm at the back to allow for ventilation.
60 to 80cm at the sides to allow mainte-
nance.
Sufficient space must be left at the front so
that the operator can work correctly and
safely.
Levelling should be carried out correctly on a
hard and stable floor surface, capable of sup-
porting the considerable weight of the machine
(between 400 and 500kg on 1,6 to 2 m
2
).
The installation of this machine like requires
a floor able to support at least 500 kg per m
2
.
2.2.3 CONNECTIONS
Electrical connection: For electrically
heated machines, the cable diameter must be
at least 4 x 10 mm
2
or 5 x 10 mm
2
, according
to voltage (220 V three-phase or 380 V
three-phase, respectively).
For machines using another heating method,
a diameter of at least 4 x 2,5 mm
2
or 5 x 2,5
mm
2
(according to voltage) is required for
safe connection.
Moreover, the electrical connection must be
made in accordance with the standards in
force. A differential circuit breaker (not in-
cluded), suiting the machine’s power con-
sumption, must be installed ahead of the
machine.
Gas connection: for machines using this
heating method, connect the device to the
existing gas piping and install a blocking
valve so that the device may be isolated from
the rest of the installation.
The installation must comply with the norms
and regulations applicable in the relevant
country.
The gas supply piping must have dimen-
sions sufficient to minimise pressure loss:
its diameter must be determined following
the route of the piping (length, number of
bends,…) and the machine power.
Check that the settings of the device corre-
spond to the type and the pressure of the gas
available at the installation site.
To check the pressure of the gas fed to the
appliance, connect a pressure gauge to the
connection situated on top of the electronic
valve module when the burner is on.
The gas pressure read must be equal to the
pressure indicated on the rating label for the
gas type used.
A pressure reducing valve (not included),
suiting the nature and the flow rate of the gas
used (see technical specifications) must be
installed on the piping close to the machine.
FUMES EXHAUST
Steam expulsion (and the expulsion of the
flue gas produced by gas-heated machines)
is done using 1 or 2 low-noise electric fans
(dynamically balanced ; flow rate: 500 m
3
/h
each).
The exhaust piping, (diameter of 98 mm at
the point where they enter the machine)
must be connected along the shortest pos-
sible path to 2 chimneys of minimum diam-
eter 100mm, or otherwise to a single chim-
ney having a diameter of at least 200mm.
The chimney exhausting the steam and smoke
produced by the dryer/ironer may under no
circumstances be shared with other devices.
2.2.4 ASSEMBLY AND
INSTALLATION PROCEDURE
In order for the machine to go through a door
of width 0.80m, the trays must be removed.
Proceed as follows:
Remove the tray.
Repeat the operation for the collection tray.
CAUTION: mind that the crank delivered
inside one of the trays is not lost.
Level the machine correctly.
Arrange for the crank, located in one of the
trays, to be at hand in a place with easy
access.
2.2.5 FIRST START UP
Verify that the machine is stable and level
upon the first start-up.
Check that all connections and exhausts are
made properly.
Check that the device is connected to earth
correctly.
Turn the circuit breaker with guard to posi-
tion 1.
Press the START button.
Check that exhaust fans revolve and that
they revolve in the correct direction (mind
the arrow on the motor).
Check that the introduction strips revolve
and that they revolve in the correct direction
(inwards).
CAUTION: do not to touch or get too close
to moving parts.
Place all casing parts back on the machine.
Check that the temperature of the whole
device rises.
Adjust the temperature in accordance with
the laundry that is to be ironed.
Proceed to perform an ironing test. The
laundry must be delivered dry and perfectly
ironed.
Should this not be the case, increase the
temperature, or reduce the ironing speed.
CAUTION: the roller is coated with wax
when leaving the factory; this is why it is
advisable to use worn laundry when per-
forming the first tests.
2.3 CONVERSION TO OTHER TYPES
OF GAS
2.3.1 NECESSARY STEPS
For this purpose, it is necessary to change
the injector and adjust the air.
Remove the screws that hold the electrical
cabinet in position on the left side and swing
the cabinet open in order to access the inside
from the left.
With the aid of a key, remove the main
injector and replace it with an injector that
suits the type of gas you wish to use.
Adjust the air bush according to the relevant
gas type.
AIR ADJUSTMENT Diagram for air adjust-
ment by means of distance “d”
Summary of Contents for C 140/33
Page 2: ......
Page 23: ...SCHEMI DIAGRAMS SCHEMAS ...
Page 24: ...VISTA LATERALE SIDE VIEW VUE ...
Page 25: ...SCHEMA D INSTALLO C200 LAYOUT DRAWING C200 PLAN D IMPLANTATION C200 ...
Page 26: ...SCHEMA D INSTALLO C160 LAYOUT DRAWING C160 PLAN D IMPLANTATION C160 ...
Page 27: ...SCHEMA D INSTALLO C140 LAYOUT DRAWING C140 PLAN D IMPLANTATION C140 ...
Page 29: ...PULIZIA PORTASONDA SENSOR CLEANING NETTOYAGE PALPEUR ...
Page 30: ...INSIEME PORTASONDA RAMPA DI DISTACCO SENSOR SEPARATION BLADES EMSEMBLE PALPEUR DECOLLEUR ...
Page 31: ......
Page 34: ...SCHEMA ELETTRICO WIRING DIAGRAM SCHÉMA ÉLECTRIQUE ...