10
308611
Setup
NOTE:
Reference numbers and letters in parentheses
in the text refer to Fig. and Parts Drawings callouts.
Charge Battery
If the battery is newly purchased or has not been used
for a long time, charge it before you use it. See
Battery
on page 18.
Level Draw Bar with RoadLazer
Use the following procedure to assure level operation
of the RoadLazer. Fig. 4.
1. Empty tow vehicle of any payload.
2. Install draw bar to measure approximately 21 in.
(53 cm) from top of ball mount to ground.
Fig. 4
Approx. 21 in.
(53 cm)
06244
1.0 in. dia. shaft
2.0 in. dia. ball
Connect RoadLazer To Vehicle
1. Install two ball mounts in hitch receivers:
a. Slide ball mount into hitch receiver.
b. Insert pin.
c. Insert clip.
2. Connect RoadLazer to ball mounts:
a. Roll RoadLazer to vehicle, and align
RoadLazer trailer arms with ball mounts.
b. Crank trailer arm jacks to clear ball mounts.
c. Roll RoadLazer forward, and align RoadLazer
trailer arms over ball mounts.
d. Crank trailer arm jacks to lower RoadLazer
trailer arms onto ball mounts.
e. Rotate jack to horizontal position. Snap
retaining handles in place to secure jacks.
f.
Secure safety pins (A) for both trailer arm
couplers and trailer arm jacks.
g. Connect safety chains.
3. Shorten each safety chain:
a. Unscrew nut fastening chain to RoadLazer.
b. Refasten chain to RoadLazer so it hooks up to
tow vehicle with minimum slack.
4. Connect control cable to RoadLazer
Programmable Skipline Controller.
NOTE:
When you unhook the RoadLazer from the
tow vehicle, replace the safety pins (A) as shown in
Fig. 5.
Fig. 5
06245A
A