Setup
16
3A2152B
8. Connect chiller with 1/4” tubing.
9. Perform Startup procedure on
10.Perform Human Machine Interface
(HMI) setup.
Appendix A - HMI Screens Overview
starting
on page 86 for more information.
a. Navigate to DRIVE/VALVE setup screen. Push
the ENABLE drive button for each component to
enable the drives.
b. If the drives have been unplugged, refer to
Appendix C - Setting Home Position on
Pumps
c. Verify the indicators read that each drive is
HOME. If not, push the HOME PUMP push but-
ton.
11.Perform Flushing Procedure start-
12.Perform System Calibration Pro-
F
IG
. 13: Chiller Connections
ti18201a
Coolant
In
Coolant
Out
NOTICE
The machine is tested with oil at the factory. Flush
out the oil with a compatible solvent before loading
the machine with material.
Summary of Contents for LSR Select
Page 7: ...Important Two Component Material Information 3A2152B 7...
Page 50: ...Parts 50 3A2152B Base Pump Wet Section 24L880 ti18115a 201 202...
Page 60: ...Parts 60 3A2152B Valve Stack 24L893 ti18160a 704 706 708 703 702 701 705 707 709 712 711 710...
Page 83: ...Control Schematics 24L890 3A2152B 83...
Page 93: ...Appendix A HMI Screens Overview 3A2152B 93...
Page 111: ...Accessories 3A2152B 111...