Setup
3A2152B
15
d. Connect the sensor lines and solenoid lines in
the third conduit to the matching valves on the
valve stack.
e. If using kit 24M127, connect the pressure trans-
ducer cables in the third conduit to the matching
transducers on the valve stack.
f.
Connect the ground wire in the sensor conduit
to the screw holding the solenoid valves to the
stack.
g. A set of clamps is supplied to keep the three
sections of conduit together. This can be
mounted on the press.
7. Connect the Air Supply.
a. Connect a 1/4” in. air supply to the solenoid
valve inlet on the valve stack.
b. Connect a 1/4 in. air supply to the solenoid
valve inlet on the base frame.
F
IG
. 10: Clamps
11.00
.50
11.50
ti18104a
NOTICE
To prevent machine damage, air supply must be fil-
tered and dried.
F
IG
. 11: Air Supply Connection - Valve Stack
F
IG
. 12: Air Supply Connection - Base
ti18105a
1/4” Air
Supply
ti18106a
1/4” Air
Supply
Summary of Contents for LSR Select
Page 7: ...Important Two Component Material Information 3A2152B 7...
Page 50: ...Parts 50 3A2152B Base Pump Wet Section 24L880 ti18115a 201 202...
Page 60: ...Parts 60 3A2152B Valve Stack 24L893 ti18160a 704 706 708 703 702 701 705 707 709 712 711 710...
Page 83: ...Control Schematics 24L890 3A2152B 83...
Page 93: ...Appendix A HMI Screens Overview 3A2152B 93...
Page 111: ...Accessories 3A2152B 111...