Operation
3A2152B
17
Operation
Startup
1. Perform all required maintenance tasks. See
starting on page 25.
2. Check for leaks.
3. Check feed system fluid levels.
4. Turn the main disconnect switch to the ON position.
The HMI will start running through its startup proce-
dure. This takes about a minute.
5. Push the power on button. The white pilot light will
illuminate.
Shutdown
Short Term/End of shift
1. Verify the cooling jackets are on and the mixed
material is being chilled. Keeping the mixed mate-
rial cool will keep the material from curing as fast.
4. Turn the main disconnect switch to the “OFF” posi-
tion.
Extended periods
3. Turn the main disconnect switch to the “OFF” posi-
tion.
4. Remove the cooling jacket from the mixer.
5. Remove the mixer from the screw.
6. Remove the bottom block from the mixer stack.
7. Clean the mixer and bottom block with a compatible
solvent.
NOTICE
To avoid curing the material within the mixer, do not
run the catalyst without the inhibitor.
Summary of Contents for LSR Select
Page 7: ...Important Two Component Material Information 3A2152B 7...
Page 50: ...Parts 50 3A2152B Base Pump Wet Section 24L880 ti18115a 201 202...
Page 60: ...Parts 60 3A2152B Valve Stack 24L893 ti18160a 704 706 708 703 702 701 705 707 709 712 711 710...
Page 83: ...Control Schematics 24L890 3A2152B 83...
Page 93: ...Appendix A HMI Screens Overview 3A2152B 93...
Page 111: ...Accessories 3A2152B 111...