16
20. Route the Low Cable (53) under a 90mm Pulley
(48) and through the Lower Upright (93).
Attach the 90mm Pulley (48) inside the Lower
Upright (93) with an M10 x 67mm Bolt (71), two
M10 Washers (57), two 12mm Spacers (52), and
an M10 Locknut (56).
21. Route the Low Cable (53) over a 90mm Pulley
(48).
Attach the 90mm Pulley (48) and two Half Finger
Guards (43) to the Double “U”-bracket (63) with
an M10 x 46mm Bolt (81) and an M10 Locknut
(56).
Make sure that the Half Finger Guards
are on the outside of the Double “U”-bracket
as shown.
20
56
53
52
52
57
57
48
71
21
56
53
48
43
43
63
81
22. Route the Low Cable (53) under a 90mm Pulley
(48).
Attach the 90mm Pulley (48) and two Half Finger
Guards (43) to the Base (1) with an M10 x 46mm
Bolt (81) and an M10 Locknut (56).
Make sure
that the Half Finger Guards are on the outside
of the bracket as shown.
22
53
43
1
43
81
56
48
Bracket
93