18
26. Wrap the High Cable (55) under a 90mm Pulley
(48).
Attach the 90mm Pulley (48), a Cable Trap (51),
and two Half Finger Guards (43) at the upper
hole in the “U”-bracket (45) with an M10 x 51mm
Bolt (66) and an M10 Locknut (56).
Make sure
that the Cable Trap is oriented to hold the
High Cable (55) in the groove of the Pulley
and that the Half Finger Guards are on the
outside of the “U”-bracket.
28. Route the High Cable (55) over a 90mm Pulley
(48) and down through the Top Frame (4).
Attach the 90mm Pulley (48) inside the Top
Frame (4) with an M10 x 67mm Bolt (71), two
M10 Washers (57), two 12mm Spacers (52), and
an M10 Locknut (56).
27. Route the High Cable (55) up through the Top
Frame (4) and over a 90mm Thin Pulley (47).
Attach the 90mm Thin Pulley (47) inside the Top
Frame with the M10 x 67mm Bolt (71) used in
step 25, an 11mm Spacer (49), an M10 Washer
(57), and an M10 Locknut (56).
26
27
28
66
51
56
48
55
43
43
45
55
47
71
71
4
49
57
56
55
52
52
48
57
4
57
56