14
14. Route the Arm Cable (54) over a “V”-pulley (46).
Attach the “V”-pulley (46), a Large Cable Trap
(50), two Full Finger Guards (41), and an M10
Washer (57) to the Upper Upright (3) with an M10
x 63mm Bolt (75) and an M10 Locknut (56).
Make sure that the Large Cable Trap is orient-
ed to hold the Arm Cable (54) in the groove of
the “V”-pulley.
56
3
57 46 50
41
75
54
41
14
16. Route the Arm Cable (54) over a “V”-pulley (46).
Attach the “V”-pulley (46), a Large Cable Trap
(50), two Full Finger Guards (41), and an M10
Washer (57) to the Upper Upright (3) with an M10
x 63mm Bolt (75) and an M10 Locknut (56).
Make sure that the Large Cable Trap is orient-
ed to hold the Arm Cable (54) in the groove of
the “V”-pulley.
15. Route the Arm Cable (54) under a 90mm Pulley
(48).
Attach the 90mm Pulley (48) and two Half Finger
Guards (43) to the Double “U”-bracket (63) with
an M10 x 46mm Bolt (81) and an M10 Locknut
(56).
Make sure that the Half Finger Guards
are on the outside of the Double “U”-bracket
as shown.
48
43
43
63
81
56
54
15
16
56
3
57
46
50
41
75
54
41