•Page
globalcontract.com
4
GLOBAL
Contract
• August 2018
INSTALLATION GUIDELINES
Sidebars
Bumpers
Screw socket CSK UNC
1/4-20x5/8” Zn
Bumper ø 1/2”x 1/8”
Transparent
Bumper 1/2”x 1/2”x1/4”
Transparent
Right Hand / Left Hand
Sidebars
Fasten sidebars in threaded holes on top of crossbars with countersunk screws.
Various types of sidebars exist, some of which can be placed in optional positions.
The holes closest to the ends of the sidebar are dedicated for fixing of work top but
any available hole can be used for this purpose.
The work top is resting on the sidebars and on self-adhesive
rubber bumpers placed on the crossbars. The bumpers should
be placed as close to the fixing screws for the work top as pos-
sible to keep the work top from bending.
The rubber bumpers come in two thicknesses. The thicker ones
are used on the C-channel. On fixed crossbars the thick bumpers
are not used.
Two sizes of wood screws for the work top are included
in the assembly kit. Wood Screw Round 8x3/4” Zn Wood
screw CSK 10x2-3/8” Zn
The shorter screws through sidebars. The longer screws
through crossbars.
Place the thin bumpers on the
tube next to the screw hole
and next to the tube edge.
Place the thick bumpers on
the C-channel next to the
screw hole.