INSTALLATION GUIDELINES
BWAEFF Floor Feed Housing
STEP 1: Rotate the base feed mounting bracket into the bottom slot in the
column cross beam.
STEP 2: Push the bracket against the leg column, align the bracket round
hole with threaded hole in the bottom of the column cross beam. (The
bracket shares screws with the trough bridge which needs to be installed
first,followed by the base feed mounting bracket .) screw ports on Ceiling
feed pole extrusion with holes in Trough bridge. (??)
STEP 3: Secure the base feed mounting bracket with the supplied 1/4-20
screw.
STEP 4: Position the base feed cover in place
A) connect Base feed’s connector to adjacent power distribution Module.
B) Tuck-in the data cable bundle so that it enters the cover through the front
bottom hole and exits through the top front hole and into the power trough.
STEP 5: Close the cover, align the holes.
STEP 6: Secure the cover with four supplied machine screws.
STEP 7: Complete the installation of the power distribution components and
data cables before snapping them into the bottom trough channel.
STEP 8: Normally symmetrical bottom trough channel associated with the
trough bridge needs to be trimmed on the adjacent side of the Base feed:
A: To avoid the bottom trough channel extrusion to interfere with the power
and data conduits from the existing base feed, please cut it off at one notch
down as illustrated.
B: Completed installation.