Page
•
globalcontract.com
11
• August 2018
GLOBAL
Contract
INSTALLATION GUIDELINES
Back-2-back trough
Secure the column cross beam to the columns.
STEP 1: Drive twos head screws 5/16-18 x 1” into the column cross beam as illustrated. Do
not tighten.
STEP 2: Drop in the trough and guide slots over the preinstalled socket head screws.
Note: Check if the installation calls for central, shared divider. If so, install the divider’s bottom
brackets now, before tightening the socket screws. If not, proceed to step 3.
STEP 3: Tighten all socket head screws.
STEP 4: Install the power distribution components and data cables before
snapping into the bottom trough channel.
1
3
2
4