Page
•
globalcontract.com
17
• August 2018
GLOBAL
Contract
INSTALLATION GUIDELINES
BWAECF Ceiling Feed Post
Proceed with the installation of the ceiling feed power pole only after all the table
assemblies and interconnecting trough bridges had been installed and their position
finalized.
STEP 1: Remove bottom trough channel.
STEP 2: Align screw ports on ceiling feed pole extrusion with holes in the trough
bridge.
STEP 3: Secure the pole to the trough bridge with the supplied screws.
STEP 4: Install the power distribution components and data cables before snapping
them into the bottom trough channel.
1
2
3
4