5. With the hexagonal dynamometric wrench tighten with the
wrench calibrated to the value given by the manufacturer of the
dowels and make the anchorage open. The anchorage stay will
immediately take the weight.
6. Perforate the other 3 remaining holes and insert the anchorage stays as in previous points 2-5.
7. After an hour, tighten the anchorage stays again with the prescribed bolt torque.
Chemical anchorage:
fix the plate with n° 4 Hilti HIT-HY 150 model chemical injection anchoring
elements with HAS M12, following the indications issued by the Hilti manufacturing company.
After having seen to the arrangement of the chemical dowels to the ceiling, fix the plate with nuts and
counter-nuts for every stay, locking with the hexagonal dynamometric wrench, and then tightening with
the calibrated wrench to the value given by the manufacturer of the dowels.
For both anchoring solutions, the nuts need to be tightened on the threaded bars,
placing a drop of Loctite code 243 medium thread delay.
2.1.2 Anchoring plate with wall in SECONDARY CONCRETE
In this case it is compulsory to sandwich the wall between the plate and the supplementary counter-plate
or use a system of sandwiched plates for preparing the wall.
The plate and the counter-plate must enclose each other with n° 4 M12 threaded steel bars each, blocked
at the upper and lower ends with relative washers, nuts and counter-nuts.
After having seen to the preparation of the ceiling, fix the plate with nuts and counter-nuts for every stay
and, locking with the hexagonal dynamometric wrench, tighten with the wrench calibrated to the value
given by the dowel manufacturer.
2.2 Electrical preparation of the premises
The work of preparing the electrical plant of the premises designated for medical use for
the electrical supply to the Product must be carried out safely according to good rules by
qualified personnel.
Qualified personnel means, as non-exhaustive examples, the following professional
figures:
Expert electro-technicians, qualified to exercise the profession of electrician
Summary of Contents for SATURNO WALL
Page 30: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 30 of 34 6 2 Explode drawing...
Page 31: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 31 of 34...
Page 32: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 32 of 34...
Page 33: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 33 of 34...
Page 34: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 34 of 34...