3.2 Installation oscillating arm
Unscrew the three screws TSCE M4x8 from the circular metal ring of
the oscillating arm (1).
Join the electrical connectors (2) respecting the colours of the electrical
cables:
•
yellow/green with yellow/green
•
blue with blue
•
brown with brown
Align the hinge (1) of the vertical oscillating arm with the horizontal
arm to (2). Keep aligned on the same axis the parts to couple and align
the hole of the contact crawling (3) with the threaded hole of the
horizontal arm (4) that will have then to be centred from screw TSCE
M3x15.
Insert the hinge of the oscillating arm in the horizontal structure being
lend cure to the operation, avoiding to force the union if there is not
right position in the connection.
Push until end of vertical oscillating arm in the horizontal arm.
Prepare three screws TSCE M4x8 with a veil of Loctite 243 on
everybody and screwing them to the horizontal arm holes.
1
2
1
2
3
4
Summary of Contents for SATURNO WALL
Page 30: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 30 of 34 6 2 Explode drawing...
Page 31: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 31 of 34...
Page 32: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 32 of 34...
Page 33: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 33 of 34...
Page 34: ...MO003 GB 18 05 06 Operative Manual Rev 0 Page 34 of 34...