INSTALLATION
MANUAL
EN
MI_020
Rev.1
29/04/2020
Page 13 of 24
Chemical anchoring
Drill the ceiling using the template provided. Insert the resin inside
the 6 drilled holes and fill the hole, carefully following the
manufacturer’s instructions. GIMA recommends using HILTI HIT-HY
270 resin or similar products.
Fit 6 threaded bars into the holes. GIMA recommends M16 bars.
Proceed to fasten the ceiling plate with nuts and locknuts for each
tie-rod and tighten using the Allen key.
Hollow-core concrete
In this case the ceiling must be sandwich closed by means of the
ceiling plate and counter-plate, being careful to include at least
one rafter.
Do not install the Product on
unsuitable ceilings.
The plate and counter-plate must be fastened together using
suitable M16 threaded steel bars, with ultimate tensile strength of at
least 800 MPa, blocked at the top and bottom ends by relative
washers, nuts and locknuts.
4.3
Instructions for ceiling version of
Product
4.3.1
Installation of the ceiling plate, bar, power
supply
VERSION WITH PRE-PREPARED TIE RODS OR CHEMICAL ANCHORAGE
If the tie rods are not prearranged in advance, place the template
(drawing 12) (2) on the ceiling (1) and secure it with adhesive tape
(3).
Drill the holes according to paragraph 4.2 and insert the 6 threaded
bars M16 (4) into the ceiling.
Summary of Contents for GIMAled81
Page 37: ...MANUALE D USO E MANUTENZIONE IT MU_027 Rev 1 29 04 2020 Pag 13 di 33 Modello a piantana...
Page 57: ...MANUALE D USO E MANUTENZIONE IT MU_027 Rev 1 29 04 2020 Pag 33 di 33 Note...
Page 94: ...OPERATION AND MAINTENANCE MANUAL EN MU_027 Rev 1 29 04 2020 Page 13 of 33 Mobile model...
Page 114: ...OPERATION AND MAINTENANCE MANUAL EN MU_027 Rev 1 29 04 2020 Page 33 of 33 Notes...