11
Installation
GBF
−
35 / GBF
−
50 Fryers
BEFORE BEGINNING:
•
NOTE: These test should be performed for each unit of a multiple well system.
• As necessary, remove baskets, screens and filter pan from unit(s).
• As applicable, on control panel(s) set switches
(POWER, HEAT, PUMP, LIFT)
in the
[OFF]
position
• Confirm that
DRAIN VALVE(S)
are
[CLOSED]
&
DISCHARGE HOSE*
valve is in
[CLOSE]
position
• If the unit is equipped with
Bulk Waste Oil option
, place
WASTE VALVE
in
[CLOSE]
position.
• If any of the following tests fail to produce the described result, consult
Section 6, Troubleshooting
, or contact
GILES
Technical Service at 800.554.4537
for assistance.
2.09 Finalizing Installation
−
continued
* Valve is only inside cabinet with the filter pan
2.09.1
Power Test
1. Confirm that circuit breakers supplying power to unit are ON.
If a disconnect switch is installed between electrical panel and
fryer, be sure that switch is in the ON position
.
2. Place
POWER
switch in
[ON]
position. Green
POWER
light
turns ON and the computer controller powers up. When alarm
signal sounds after power
up, press
[ALARM]
key to silence,
leave
POWER
switch
[ON]
and proceed to
Section 2.09.2
.
If the
POWER
light does not turn ON and/or controller does
not power
up, refer to
Section 6.01, Troubleshooting
Procedures
.
This test confirms that the unit is receiving power properly.
Perform test for each unit of a banked well system.
POWER
ALARM
Summary of Contents for GBF-35
Page 10: ...4 ...
Page 22: ...16 Overview GBF 35 GBF 50 Fryers 3 01 Baskets Optional Auto Basket Lifts 2 Hidden 1 4 3 ...
Page 34: ...28 Overview GBF 35 GBF 50 Fryers Notes ...
Page 68: ...62 Fryer Operation GBF 35 GBF 50 Fryers ...
Page 78: ...72 Troubleshooting GBF 50 Fryer ...
Page 100: ...94 Parts List GBF 35 GBF 50 Fryers 7 12 Filter Pan 3 1 5 4 2 9 7 10 6 8 A ...
Page 102: ...96 Parts List GBF 35 GBF 50 Fryers Notes ...
Page 103: ......