2.06 Ventilation
Consult a professional ventilation contractor or HVAC company to determine if an existing system is sufficient to
provide proper ventilation for this equipment, or to design and specify a ventilation hood system that will be
compliant with code requirements.
2.05.1
Electrical Connections Diagram
Flexible Conduit
Service Box
Connect flex conduit from
incoming supply power
here.
Ground Lug
Distribution Block:
connect supply power
to this side.
GBF
−
35 / GBF
−
50 Fryers
Installation
8
Main Breaker
Box
Disconnect Switch
Box
(Recommended)
NOTE:
Guidelines and codes for ventilation system requirements differ from locale to locale. Always consult the local
Code Authorities (AHJ)
to ensure proper compliance.
Summary of Contents for GBF-35
Page 10: ...4 ...
Page 22: ...16 Overview GBF 35 GBF 50 Fryers 3 01 Baskets Optional Auto Basket Lifts 2 Hidden 1 4 3 ...
Page 34: ...28 Overview GBF 35 GBF 50 Fryers Notes ...
Page 68: ...62 Fryer Operation GBF 35 GBF 50 Fryers ...
Page 78: ...72 Troubleshooting GBF 50 Fryer ...
Page 100: ...94 Parts List GBF 35 GBF 50 Fryers 7 12 Filter Pan 3 1 5 4 2 9 7 10 6 8 A ...
Page 102: ...96 Parts List GBF 35 GBF 50 Fryers Notes ...
Page 103: ......