
89
Cleaning & Maintenance
GBF-2-GVH Ventless Fryer
1. Confirm that the fire hazard potential has not changed.
2. Inspect suppressant storage tank for fill level and charge pressure.
3. Inspect and test the release mechanism.
4. Check all nozzles to ensure they are free of grease build-up. Confirm that all nozzle blow-off aps are in place
and in good condition; replace as needed. See
Section 2.06.4, Fire Extinguisher Nozzle Locations
.
5. Inspect and test the remote manual activation station for function and wear.
6. Install test link and cut to test automatic actuation.
7. Inspect and clean fusible links. Confirm that fusible links are of the correct temperature rating. See
Section 2-
06.3, Fire Suppression Fusible Link Specifications & Location
.
8. Inspect fusible link conduit and wire cable for wear at pulleys and detectors; replace if necessary.
9. Record maintenance date and service performed in a permanent file, and sign-off on tag attached to system in
a conspicuous location.
Service and inspection of the fire suppression system must be performed by qualified and Ansul® Distributor/Dealer. As
a minimum, field inspection of the fire suppression system must be conducted semi-annually (every 6 months). Such
maintenance shall consist of the following:
The annual inspection and maintenance is the same as the semi-annual inspection except that all fusible links must
be replaced with new links. See
S
ection 2-06.3, Fire Suppression Fusible Link Specifications & Location.
Same as annual inspection and maintenance except for the following:
1. Replace wet-chemical fire suppressant.
2. Hydrostatic test and certify Suppressant Tank and Compressed Gas Charging Cartridge. As alternative
components can be replaced with new.
3. Flow test the regulator.
6.06.1
Semi-Annual (6-Mo) Fire Suppression System Inspection & Maintenance
6.06.2
Annual (12-Mo) Fire Suppression System Inspection & Maintenance
6.06.3
12-Year Fire Suppression System Inspection & Maintenance
Summary of Contents for GBF-2-GVH Series
Page 2: ......
Page 4: ......
Page 12: ...x ...
Page 16: ...4 Introduction GBF 2 GVH Ventless Fryer ...
Page 26: ...Installation 14 GBF 2 GVH Ventless Fryer ...
Page 28: ...16 Overview 1 GBF 2 GVH Ventless Fryer 3 01 Baskets Auto Basket Lifts Optional 2 4 3 Hidden ...
Page 36: ...24 Overview GBF 2 GVH Ventless Fryer 3 05 Hood Control Panel 3 5 2 4 1 6 7 8 9 10 ...
Page 38: ...26 Overview GBF 2 GVH Ventless Fryer Not Shown 3 06 Hood Front Filter Chamber 3 5 2 4 1 6 7 ...
Page 46: ...34 Overview GBF 2 GVH Ventless Fryer ...
Page 52: ...40 GBF 2 GVH Ventless Fryer Pre Operation Tests ...
Page 93: ...81 Operation GBF 2 GVH Ventless Fryer ...
Page 103: ...91 ...
Page 111: ...99 Troubleshooting GBF 2 GVH Ventless Fryer ...
Page 112: ...100 Troubleshooting GBF 2 GVH Ventless Fryer ...
Page 128: ...116 Parts List GBF 2 GVH Ventless Fryer 3 1 5 4 2 8 9 7 10 6 A 8 09 Filter Pan ...
Page 134: ...122 Parts List GBF 2 GVH Ventless Fryer 8 12 Hood Filter Fan Compartment 1 2 3 4 5 6 7 8 ...
Page 136: ...124 Parts List GBF 2 GVH Ventless Fryer 2 1 3 4 8 13 Under Hood Components ...
Page 138: ...126 Parts List GBF 2 GVH Ventless Fryer ...
Page 139: ......