11.5
Commissioning the Unit
See the separate '
Commissioning
' manual provided with the unit.
11.6
Documentation
Excpl. In the view shown above commissioning on 15/04/2015 was made. Accordingly, the
recommended granules exchange is carried out in April 2020th
Note
1. Commissioning must be entered into the maintenance history.
2. Complete the commissioning report and send it to Georg Fischer
JRG.
Summary of Contents for JRG Coral force 11000
Page 2: ...Seite 2 von 68 Rev 1113803 1...
Page 15: ...Seite 15 von 68 Rev 1113803 1...
Page 23: ...Seite 23 von 68 Rev 1113803 1 7 2 Filling and bleeding...
Page 24: ...Seite 24 von 68 Rev 1113803 1...
Page 25: ...Seite 25 von 68 Rev 1113803 1...
Page 29: ...Seite 29 von 68 Rev 1113803 1...
Page 30: ...Seite 30 von 68 Rev 1113803 1 8 1 1 Initialisation and Settings Automatic Hygiene Program...
Page 31: ...Seite 31 von 68 Rev 1113803 1...
Page 32: ...Seite 32 von 68 Rev 1113803 1...
Page 33: ...Seite 33 von 68 Rev 1113803 1...
Page 64: ...Seite 64 von 68 Rev 1113803 1 Close filler plug tightly...