7.3
Fitting thermal insulation and thermometer
U
Check for Leaks
Before fitting the insulation, check installation and unit for any leaks,
including the base of the vessel.
Fit the thermal insulation:
1.
Close the sealing rail on one
of the two sides of the
valves.
2.
Bend the insulation sections
around the vessel and seal
on the opposite side.
3.
Fit PS cover in position
4.
Fit snap-in clamps at top and
bottom
5.
Place PS cover over
maintenance flange
Summary of Contents for JRG Coral force 11000
Page 2: ...Seite 2 von 68 Rev 1113803 1...
Page 15: ...Seite 15 von 68 Rev 1113803 1...
Page 23: ...Seite 23 von 68 Rev 1113803 1 7 2 Filling and bleeding...
Page 24: ...Seite 24 von 68 Rev 1113803 1...
Page 25: ...Seite 25 von 68 Rev 1113803 1...
Page 29: ...Seite 29 von 68 Rev 1113803 1...
Page 30: ...Seite 30 von 68 Rev 1113803 1 8 1 1 Initialisation and Settings Automatic Hygiene Program...
Page 31: ...Seite 31 von 68 Rev 1113803 1...
Page 32: ...Seite 32 von 68 Rev 1113803 1...
Page 33: ...Seite 33 von 68 Rev 1113803 1...
Page 64: ...Seite 64 von 68 Rev 1113803 1 Close filler plug tightly...