9.2
Thermal Disinfection (TD)
To ensure continued supply to the
installation during thermal
disinfection, water passes through
a bypass in the overflow valve. The
main ball valve is set to the shut-off
position. The water is heated using
an electric heater rod and
transported into the vessel by the
charging pump.
(Note that heating takes place
under pressure!)
Target temperature: 75°C
Total duration of disinfection
process: approx. 3-5 h (depending
on vessel size).
Flashes slowly (about every 5 sec.)
off
Display
off
Summary of Contents for JRG Coral force 11000
Page 2: ...Seite 2 von 68 Rev 1113803 1...
Page 15: ...Seite 15 von 68 Rev 1113803 1...
Page 23: ...Seite 23 von 68 Rev 1113803 1 7 2 Filling and bleeding...
Page 24: ...Seite 24 von 68 Rev 1113803 1...
Page 25: ...Seite 25 von 68 Rev 1113803 1...
Page 29: ...Seite 29 von 68 Rev 1113803 1...
Page 30: ...Seite 30 von 68 Rev 1113803 1 8 1 1 Initialisation and Settings Automatic Hygiene Program...
Page 31: ...Seite 31 von 68 Rev 1113803 1...
Page 32: ...Seite 32 von 68 Rev 1113803 1...
Page 33: ...Seite 33 von 68 Rev 1113803 1...
Page 64: ...Seite 64 von 68 Rev 1113803 1 Close filler plug tightly...