fu-processx-en 23
www.georgin.com
Instruction manual - ProcessX
Impulse pipe
Vent valve
Pressure tap
Isolating
valve
6WHDPPHDVXUHPHQW
A condensate chamber must be mounted between trans-
mitter and process connection.
Fill the pipe between the condensate chamber and the
transmimitter with water.
The installation of a drain is necessary.
Impulse pipe
Isolating valve
Process pipe
Vent valve
Pressure tap
*DVPHDVXUHPHQW
Place the transmitter above the pressure source.
If high temperature, use condensate chamber like for steam.
&DXWLRQVRQLPSXOVHSLSLQJ
)RUOLTXLGWKHLPSXOVHSLSHVVKRXOGKDYHDQGRZQZDUGVORSHRIRUPRUHEHWZHHQWKHSUR
-
cess connection and the transmitter to prevent accumulation of gas, etc. in the detecting unit.
)RUJDVWKHLPSXOVHSLSHVVKRXOGKDYHDXSZDUGVORSHRIRUPRUHEHWZHHQWKHSURFHVV
connection and transmitter to prevent accumulation of liquid or condensat, etc. in the detecting
unit.
$YRLGDQ\VKDUSEHQGVLQLPSXOVHSLSHZKLFKPD\FDXVHJDVRUOLTXLGWRDFFXPXODWHLQWKH
impulse pipe.
'RQRWDSSO\DQH[FHVVLYHIRUFHWRLPSXOVHSLSHGXULQJWKHFRQQHFWLRQ
,QVWDOOFRQGHQVDWHFKDPEHUVRUYHQWGUDLQZKHQLPSXOVHSLSHVFDQQRWEHLQFOLQHG
7KHLPSXOVHSLSHVXVHGVKRXOGEHVXLWDEOHIRUWKHZRUNLQJWHPSHUDWXUHSUHVVXUHVWDQGDUGV
'XULQJLQVWDOODWLRQDYRLGPHFKDQLFDOFRQVWUDLQVRIWKHWUDQVPLWWHUFRQQHFWLRQV
,QFDVHRIH[WHUQDOGHJUDGDWLRQFRUURVLRQRYHUÀRZVKRFNHWFRULQFDVHRI¿UHWKHFRQ
-
cerned transmitter must be checked before commissioning.
7RDYRLGWKHGHWHULRUDWLRQRIWKHWUDQVPLWWHUPRXQWHGH[WHUQDOO\LWZLOOEHPRXQWHGLQDER[
protection.
7KHWUDQVPLWWHUVKRXOGQHYHUEHH[SRVHGWR¿UH,QFDVHRI¿UHWKHWUDQVPLWWHUFKDUDFWHULVWLFV
need to be checked before started up. The transmitter must not be reused if it has been partially
RUWRWDOO\H[SRVHGWR¿UHDQGKHDW
)UHH]HSURWHFWLRQ
,IWKHÀXLGFDQIUHH]HWKHWUDQVPLWWHUDQGWKHLPSXOVHSLSHPXVWEHZDUPHGXSZLWKVWHDPRUD
heater.
Do not exceed the temperature limits (measuring cell: 120°C maxi and transmitter: 85°C).
Even when the installations shut down the heat must be maintained, if not the transmitter and
impulse pipes must be drained to prevent freezing.