V 10/17
MagicCompact BA04
Start-up
•
21
Start-up
Set-up and assembly
Installation
Installation work to be done by the customer must be carried out accord-
ing to local safety regulations!
Cable connections / junctions
The connecting cables between control unit and guns must be laid out in
such a way that they cannot be damaged during operation. Observe the
safety regulations!
Grounding
The ground connection of the booth should be checked each time the
equipment is put into operation. The grounding connection is customer
specific and fitted on the booth basement, the cyclone separator and the
filter housing.