
GEAX
s.r.l.
Chapter 2
DRILLING MACHINE SCHEDULED MAINTENANCE
2-3
fig.2.2.1.2
LUBRICATION INTERVENTIONS FREQUENCY
L
U
B
R
IC
A
T
ION
P
OI
N
T
DESCRIPTION OF INTERVENTION POINTS
IN
TE
R
V
E
N
T
ION
FR
E
QU
E
N
C
Y
[h
o
u
rs
]
TY
P
E
O
F
GR
E
A
S
E
NOTES
1
Swing post (2 point)
600
A
2
Swing post cylinder (2 points)
600
A
3
Pull-push hydraulic cylinder (2 points)
600
A
4
Rotary slewing ring (2points)
50
B
5
Rotary gears (2 points)
200
B
6
Sliding guides (8 points)
50
A
+ every wash with
pressure washer
7
Swivel bearing (1 point)
50
B
8
Kelly guide
50
A
To be done with a
brush
Main winch rope
200
C
During slow descent
of the kelly bar into a
rather deep hole
Auxiliary winch rope
600
C
By
unwinding
it
without letting it touch
the ground
tab.2.2.1.3
Summary of Contents for XD5
Page 1: ...MAINTENANCE MANUAL Rev 01 17 GEAX s r l XD5...
Page 20: ...GEAX s r l Chapter 3 MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M 3 3...
Page 21: ...GEAX s r l Chapter 3 MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M 3 4...
Page 22: ...GEAX s r l Chapter 3 MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M 3 5...