
GEAX
s.r.l.
Chapter 3
MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M.
3-8
•
Release the cable gland springs
fig. 3.2.3.5;
fig.3.2.3.5
•
prepare the new rope according to
fig.3.2.3.6
fig.3.2.3.6
•
Secure the end of the new rope to the winding drum by wrapping it around
the "A" thimble
fig.3.2.3.2
, clamping it inside the pocket using a copper or
rubber hammer as shown in
fig.3.2.3.4
;
•
control the rewinding by accompanying the rope so that it lays in adjacent
turns that are neatly side by side; do not put your hands near the winch
drum while it is rewinding (stay at least 1 metre away); to juxtapose the
turns use a copper hammer;
•
When rewinding is almost completed, position the cable gland by hanging
the spring
fig.3.2.3.5
;
•
Check the thrust bearing condition by opening the swivel, not only when it
is considered to be the cause of rope damage;
Summary of Contents for XD5
Page 1: ...MAINTENANCE MANUAL Rev 01 17 GEAX s r l XD5...
Page 20: ...GEAX s r l Chapter 3 MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M 3 3...
Page 21: ...GEAX s r l Chapter 3 MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M 3 4...
Page 22: ...GEAX s r l Chapter 3 MAINTENANCE ACCORDING TO THE CONDITIONS OF THE DRILLING M 3 5...