MAINTENANCE: Checkout Procedure
3-20
Solar 7000/8000/View Patient Monitor
Revision J
414993-001
Tram-net Communication
Check
Do the following to check the Tram-net communication network.
1.
If a Tram-net hub is used, plug the Tram-rac housing cables into each
of the four Tram-net connectors (blue). Verify that the waveforms
recover on the monitor display each time the cable is reconnected.
2.
If a Tram-rac 2 housing with an ASYNC COMM connector (red) at
the rear of the unit is used, the functional test of Tram-net must be
performed using another Tram-net peripheral device (i.e. remote
control).
LAN Network Check
Do the following to check the monitoring network, if used.
1.
Disconnect the patient cable from the Tram module and verify
alarms at the central station.
2.
Select GRAPH GO/STOP and verify graphing at the Centralscope
central station.
Remote Control Check
Do the following to check the remote control.
1.
Plug the remote control into a Tram-net connector (blue). Check all
functions of the Trim Knob control and 12 hard keys. Verify a
response at the monitor display.
2.
Plug the remote control into the auxiliary async connector (red) at
the rear of the monitor. Check all functions of the Trim Knob control
and 12 hard keys. Verify a response at the monitor display.
Video/Alarm Check
If the monitor has a remote video/remote alarm, do the following to check
it.
1.
If a remote display is used, check the connection from the monitor.
The remote display should show all real time waveforms exactly the
same as the display on the monitor.
2.
Remote alarm indicators are site dependent. Verify proper operation
by disconnecting the patient cable from the Tram module. The
remote alarm should activate when an alarm is heard from the
monitor.
Tram-net Interface Check
If the monitor uses a Tram-net interface assembly connected to a device,
do the following to check it.
1.
Connect the Tram-net interface assembly and device. Use the
appropriate Tram-net interface assembly manual and device manual
for interconnection directions.
2.
Observe correct type of device identified at the monitor.
3.
Simulate and observe waveform on monitor.
Octanet Check
For the Octanet checkout procedure see “Octanet Connectivity Device
Service Manual” pn 418264-003
Summary of Contents for Solar 7000
Page 1: ...Solar 7000 8000 SolarView Patient Monitor Field Service Manual 414993 001 Revision J ...
Page 10: ...CONTENTS viii Solar 7000 8000 View Patient Monitor Revision H 414993 001 For your notes ...
Page 11: ...Revision J Solar 7000 8000 View Patient Monitor 1 1 414993 001 1 INTRODUCTION ...
Page 12: ...INTRODUCTION 1 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Page 19: ...Revision J Solar 7000 8000 View Patient Monitor 2 1 414993 001 2 EQUIPMENT OVERVIEW ...
Page 63: ...Revision J Solar 7000 8000 View Patient Monitor 3 1 414993 001 3 MAINTENANCE ...
Page 64: ...MAINTENANCE 3 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Page 87: ...Revision J Solar 7000 8000 View Patient Monitor 4 1 414993 001 4 TROUBLESHOOTING ...
Page 88: ...4 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Page 135: ...Revision J Solar 7000 8000 View Patient Monitor 5 1 414993 001 5 CALIBRATION ...
Page 136: ...CALIBRATION 5 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Page 153: ...Revision J Solar 7000 8000 View Patient Monitor 6 1 414993 001 6 CONFIGURATION ...
Page 154: ...6 2 Solar 7000 8000 View Patient Monitor Revision J 414993 001 For your notes ...
Page 183: ...Revision J Solar 7000 8000 View Patient Monitor 7 1 414993 001 7 UPPER LEVEL ASSEMBLY ...
Page 213: ......
Page 214: ......