GE Power Management
PQM Power Quality Meter
8-7
8 DNP COMMUNICATIONS
8.1 DNP 3.0 PROTOCOL
8
8.1.6 BINARY OUTPUT / CONTROL RELAY OUTPUT POINT LIST
POINT LIST FOR: BINARY OUTPUT (OBJECT 10)
CONTROL RELAY OUTPUT BLOCK (OBJECT 12)
INDEX
DESCRIPTION
0
Reset
1
Alarm relay on
2
Alarm relay off
3
Auxiliary relay 1 on
4
Auxiliary relay 1 off
5
Auxiliary relay 2 on
6
Auxiliary relay 2 off
7
Auxiliary relay 3 on
8
Auxiliary relay 3 off
9
Display 40 character flash message for 5 seconds (next to useless at the moment, since you have to set
up the display message using Modbus)
10
Clear energy values
11
Clear max. demand values
12
Clear min./max current values
13
Clear min./max voltage values
14
Clear min./max power values
15
Clear max. THD values
16
Clear switch input pulse count
17
Clear event record
18
Simulate “SETPOINT” keypress
19
Simulate “ACTUAL” keypress
20
Simulate “RESET” keypress
21
Simulate “STORE” keypress
22
Simulate “MESSAGE UP” keypress
23
Simulate “MESSAGE DOWN” keypress
24
Simulate “MESSAGE LEFT” keypress
25
Simulate “MESSAGE RIGHT” keypress
26
Simulate “VALUE UP” keypress
27
Simulate “VALUE DOWN” keypress
Summary of Contents for Power Quality Meter Series
Page 2: ......
Page 4: ......
Page 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Page 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Page 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Page 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Page 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Page 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Page 281: ...GE Power Management PQM Power Quality Meter NOTES ...