5-18
PQM Power Quality Meter
GE Power Management
5.2 A1 METERING
5 MONITORING
5
TIME OF LAST RESET: This message displays the time and date when the pulse input values were last
cleared. The
S1 PQM SETUP \ CLEAR DATA \ CLEAR PULSE INPUT VALUES
setpoint clears the pulse input values.
Figure 5–11: PULSE INPUT TIMING
150 ms
OPEN
CLOSED
OPEN
OPEN
CLOSED
CLOSED
SWITCH ACTIVATION
= OPEN
SWITCH ACTIVATION
= CLOSED
STATUS
STATUS
STATUS
150 ms
Summary of Contents for Power Quality Meter Series
Page 2: ......
Page 4: ......
Page 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Page 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Page 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Page 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Page 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Page 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Page 281: ...GE Power Management PQM Power Quality Meter NOTES ...