![GE Ettan IPGphor 3 Operating Instructions Manual Download Page 60](http://html.mh-extra.com/html/ge/ettan-ipgphor-3/ettan-ipgphor-3_operating-instructions-manual_128030060.webp)
Position the manifold on
Ettan IPGphor 3
Follow the instructions below to position the manifold on Ettan IPGphor 3.
Action
Step
Clean and dry the Ettan IPGphor 3 platform before placing the manifold on
the system.
1
Position the manifold on the Ettan IPGphor 3 platform. The small T-shaped
protrusion fits into a cutout section of the Ettan IPGphor 3 platform near the
lid hinge.
2
Ensure that the manifold is level by placing the round spirit level on the
center of the manifold tray after it is placed on the Ettan IPGphor 3.
3
Measure out 108 ml of Immobiline DryStrip Cover Fluid (even if fewer than
12 strips will be loaded into the manifold). Add the cover fluid evenly in the
12 manifold channels.
4
60
Ettan IPGphor 3 Operating Instructions 28-9635-51 AC
5 Operation
5.1 Preparations before start
5.1.2 Use the Ettan IPGphor Cup Loading Manifold