![GE Ettan IPGphor 3 Operating Instructions Manual Download Page 40](http://html.mh-extra.com/html/ge/ettan-ipgphor-3/ettan-ipgphor-3_operating-instructions-manual_128030040.webp)
4.2
Unpacking and transport
Unpacking
Carefully unpack all items delivered and make sure that all items are present by compar-
ing the contents with the packing list. If any part is missing, please contact your local
GE sales office.
Inspect all components. If any part appears damaged, please contact the courier imme-
diately.
Please keep all packing material and use if damaged parts need to be returned for repair
or replacement.
•
Check the equipment for damage before starting assembly and installation.
•
Document any damage and contact your local GE.
•
Remove straps and packing material and stand equipment upright before starting
installation.
Transport
Before moving the system:
•
Disconnect all cables.
•
Lift the instrument by the base unit.
40
Ettan IPGphor 3 Operating Instructions 28-9635-51 AC
4 Installation
4.2 Unpacking and transport