- 46 -
eBike II, eBike II L, eBike II EL
2018112-069 Rev. F
l
oad
unIt
exCHange
• Remove the ergometer housing (see detailed
description at the appropriate ergometer type)
• Disconnect the patch cables and the power supply
cable from the LRE board
• The load unit is fixed with 6 Allen key screws at the
ergometer chassis.
Loose the screws with a ratchet - prevent the load
unit from falling down (weight approx.10 kg)
Summary of Contents for eBike II Series
Page 1: ...GE Healthcare eBike II eBike II L eBike II EL Service Manual 2018112 069 Revision F...
Page 2: ......
Page 13: ...2018112 069 Rev F eBike II eBike II L eBike II EL 13...
Page 39: ...2018112 069 Rev F eBike II eBike II L eBike II EL 39...
Page 47: ...2018112 069 Rev F eBike II eBike II L eBike II EL 47...
Page 77: ...2018112 069 Rev F eBike II eBike II L eBike II EL 77...
Page 133: ...2018112 069 Rev F eBike II eBike II L eBike II EL 133...
Page 141: ...2018112 069 Rev F eBike II eBike II L eBike II EL 141...
Page 212: ...212 eBike II eBike II L eBike II EL 2018112 069 Rev F...
Page 214: ...214 eBike II eBike II L eBike II EL 2018112 069 Rev E...
Page 216: ...216 eBike II eBike II L eBike II EL 2018112 069 Rev E 210 eBike II L EL uncrating instructions...
Page 228: ...228 eBike II eBike II L eBike II EL 2018112 069 Rev E 222 eBike II L EL uncrating instructions...
Page 233: ......