Chapter 8: Installation
This chapter provides information about the product installation.
1
Handling the Goods
Our products are of robust construction but require careful treatment before
installation on site. This section discusses the requirements for receiving and unpacking
the goods, as well as associated considerations regarding product care and personal
safety.
Before lifting or moving the equipment you should be familiar
with the Safety Information chapter of this manual.
1.1
Receipt of the Goods
On receipt, ensure the correct product has been delivered. Unpack the product
immediately to ensure there has been no external damage in transit. If the product has
been damaged, make a claim to the transport contractor and notify us promptly.
For products not intended for immediate installation, repack them in their original
delivery packaging.
1.2
Unpacking the Goods
When unpacking and installing the product, take care not to damage any of the parts
and make sure that additional components are not accidentally left in the packing or
lost. Do not discard any CDROMs or technical documentation. These should accompany
the unit to its destination substation and put in a dedicated place.
The site should be well lit to aid inspection, clean, dry and reasonably free from dust
and excessive vibration. This particularly applies where installation is being carried out
at the same time as construction work.
1.3
Storing the Goods
If the unit is not installed immediately, store it in a place free from dust and moisture in
its original packaging. Keep any de-humidifier bags included in the packing. The de-
humidifier crystals lose their efficiency if the bag is exposed to ambient conditions.
Summary of Contents for DR60
Page 12: ...12 DR60 TM EN 2A ptpd internal BSD ...
Page 24: ......
Page 78: ......
Page 93: ...DR60 93 DR60 TM EN 2A Binary inputs and outputs of the B2 board 8 BO 6 BI ...
Page 106: ......