![GE AKTA pilot 600 User Manual Download Page 116](http://html2.mh-extra.com/html/ge/akta-pilot-600/akta-pilot-600_user-manual_4072291116.webp)
Action
Step
Remove the flow cell from the detector. Do not touch the exposed optical
fiber connectors.
Note:
If you do accidentally touch the optical fiber connectors, clean them according
to
Clean the optical fiber connectors, on page 116
5
If you intend to reuse the flow cell that you have removed, move the protec-
tive caps from the replacement flow cell to the optical fiber connectors on
the removed flow cell to protect them from dust. Take care not to damage
the flow cell.
6
Fit the replacement UV flow cell to the detector.
7
Fit the detector with the replacement flow cell to the instrument front panel.
Pull the latch upwards to secure the detector.
8
Connect the tubing to the new flow cell.
9
Switch on the instrument.
10
Result: The flow cell path length is automatically recognized by the monitor
when a new flow cell is connected.
Clean the optical fiber
connectors
Follow the steps below to clean the optical fiber connectors.
116
ÄKTA pilot 600 User Manual 29274559 AA
5 Maintenance
5.5 Replacement procedures
5.5.3 Replace the UV monitor flow cell
Summary of Contents for AKTA pilot 600
Page 1: ...KTA pilot 600 User Manual...